8th August 2018

Virtual instances - Los Angeles, DC2 Nodes v704-v729 OpenVZ network upgrade

At 15:30 PST we will be performing infrastructure upgrade on equipment to which nodes v704-v729 are directly connected. This will require a change in network configuration on the affected nodes. All VMs will be gracefully shut down for this upgrade to complete.

Estimated time to complete maintenance tasks: 30 minutes.

15:52 PST Maintenance has been completed.